KING MONGKUT INSTITUTE TECHNOLOGYNORTH BANGK 115/22 kV. Sub station (Utility Phase III) Project,Prachinburi

Sub station engineering and construction 115/22 kV. sub station 30 MVA. x 2 baysoverhead & underground power system,lighting & communication system microscada & BAS system central equipment generator and cooling water system

2003

11,500,000

PROCTER & GAMBLE MANUFACTURING ( THAILAND ) LIMITED., Chacheongsao Global Olay Project

Electrical and mechanical Installation

2002

3,500,000

THAI TYRE MOLD CO.,LTD.Laemchabang, Sriracha, Chonburi (Michelin and Siam Cement Group Joint Venture) Thai Tyre Mold Extension Project

Electrical and mechanical Installation

2002

2,990,000

LGC Laos 115 KV Transmission line Project

Electrical & Mechanical installation 115 KV. transmission line LGC Laos contract (joint venture LGC & TDG) stringing 60km.1 circuit OPGW, Steel tower type

2002

1,000,000

MICHELIN SIAM CO.,LTD.Laemchabang, Sriracha, Chonburi (Michelin and Siam Cement Group Joint Venture) Thailand Laemchabang Extension (Step 2) Project

Electrical installation

2001

54,440,000

AUTO ALLIANCE (THAILAND) CO.,LTD.Pluakdaeng, Rayong (A Ford and Mazda Joint Venture)J97/P/T Project

Electrical & mechanical installation

2001

4,500,000

LHCE ENGINEERING CO., LTD.115 KV. Transmission line construction substation Project

115 KV. transmission line Trakan Phutphon Kemarach sub station and construction sub station at Sisaket - Rasisalai

2001

7,000,000